Objectives of the plan:
Designing and manufacturing two 40-inch diameter pedal flanges with a working pressure of 16 bar
Geographical location of the project:
Bushehr Province – Pars Special Economic Zone (Asalooyeh)
Implementation activities of the plan:
Designing and producing 2 flanges of 40 inches with a working pressure of 16 bar to transfer sea water
Performing mechanical calculations of the main body using the finite element analysis method by Abaqus software
Performing flange drilling operations based on ASME B 16.47 series, A standard